Rapid Solutions
Products & Systems That Speed Up Installation
These products will help you when facing compressed schedules and controlled jobsite access requiring finishing jobs faster with less manpower.
Click here to view the list of premium products and systems (with cure time comparisons) we offer:
- RAPID cure times and fewer steps speeds installations, meeting tight-turnaround times
- Proven product formulations that work overtime so you don't have to
- Finishing your installation faster helps get following trades back to work much faster
- 2-in-1 and 3-in-1 step products shave days, even weeks off schedules
- One-stop, single source manufacturer complete with installation, technical and warranty support
- All LATICRETE® RAPID and Quick Cure products are in stock and ready-to-ship
From self-leveling underlayments, anti-fracture membranes, adhesives, waterproofing membranes, resinous floor coatings, shower installation systems, thin-sets, grouts and sealants — we've got the products and systems you need to get your projects moving now.
Customer Testimonials
“When SUPERCAP® was presented to me it was a no-brainer, because #1 it cut our schedule in half, #2 it was cost effective and #3 it had a superior quality. At the end of the job when I walked the floor and I see it, all those things rang true, I mean we had a win-win-win situation for the owner”
— Mark Jones, Superintendent. Structuretone SW, San Antonio, TX
“We have a lot of healthcare renovation projects that require fast turnarounds, in this case it was Operating Rooms. We used the VAPOR BAN™ Primer ER product, it’s both a moisture barrier and primer in an all-in-one step application. We get into the project at 5pm on a Friday with the finished floor having to be ready on Monday morning at 8am.
Using this product eliminates bringing in extra labor and allows us to install sheet vinyl in just 3 hours. No more 12 hour days waiting for products to cure and sweating those 8am delivery times. We’re home for dinner on Sunday. We love it, nothing like it out there!”
— Mike Barfield, Superintendent, Acousti Engineering
Projects Utilizing Rapid Products
Roosters Brewery, Ogden, UT
When the brewery chose to open a second location, the SPARTACOTE™ system was chosen to cover 9,000 sq ft (836 m2) of floor space because of its fast return to service, antimicrobial protection and excellent abrasion, stain, and chemical resistance.
General Contractors Shorten Schedules with SUPERCAP®
GCs have discovered the SUPERCAP® floor leveling system helps them to be more productive by achieving installations in days rather than weeks. It's ideal for starting early in new construction and when major renovation projects uncover severely compromised concrete slabs.
Baha Mar Resort and Casino, Bahamas
The largest construction project in the Western Hemisphere, Baha Mar Casino and Hotel utilized several rapid products from LATICRETE to construct the $4.3 billion resort. The construction management firm chose to utilize LATICRETE® products because of our track record, capacity and product portfolio to meet the needs of this massive undertaking.Cathedral of the Holy Cross, Boston, MA
The 150-year-old cathedral received its first ever renovation just in time for 2019 Holy Week. The 20,000 square feet (1,858 m2) of 18" x 18" (46 x 46 cm) tile throughout the entire nave was installed with two rapid-setting grouts as well as several other LATICRETE products to obtain a 25-year warranty and LEED points for sustainable building.
Resources
- Rapid Solutions Brochure (English)
- Rapid Solutions Brochure (Español)
- Rapid Solutions Brochure (français)
- LATICRETE University Online Training - take free online tutorials to learn more about our rapid products and systems. Click here to access tutorials.